Royal Wedding Spain, may 2004 07/01/2004
ROYAL WEDDING H.R.H. THE PRINCE OF ASTURIAS AND MS. LETIZIA ORTIZ, MAY 22, 2004
Services Rendered: Pre-Cabling Services, Design, Installation, and Maintenance.
Equipment Supply: Design, Delivery, Installation and Maintenance supervision o 2x20 ISDN Lines SYSTEL-6000 Multiplex and Multi-conference Systems for the General Coordination System for the OBUnits during the Broadcast Operations in connection with the Event. The Systel- 6000 Systems Consists in a total Hardware Integration through Software of the AEQ Impact Digital Audio Router with AEQ Caddy AD/DA Converters and AEQ Course MultiCodec Systems. The two Systems supplied had a total Multiplexing Capability of up to 40 ISDN communications towards the MCR at Prado del Rey and viceversa, and was Hierarchically structured for 12 different levels of Multiplex, i.e. 12 simultaneous multiplex for different levels and purposes.